
TRUSS 200 × 200
Not just structure.It is the staging.
200mm box truss carries the stage — and becomes the largest graphic on it. We don't stop at standing it up. We add light and image until the structure itself is the design.
SPEC
200 Box Truss — what it's made of
Aluminium truss with a 200mm square section. Combine lengths, turn direction at the corners, and you can form straight runs, squares or polygons.

What a section looks like
Four main tubes form the corners of a square, tied together by a zigzag of thinner tubes. Each end carries a plate that bolts to the next section.
Lengths
3m
Main beams and columns
2m
Height adjustment, columns
1m
Dimension fitting
0.5m
Fine adjustment
Six-way corner (cube)
A corner block that can extend in six directions. This is where the build turns — L shapes, U shapes, portals and three-dimensional frames.
The illustration above is for reference. Length drawings show the 200 × 200mm truss from the side, true to scale against 3m.
⛐ We count quantities by length rather than quoting «one truss set». It's easier for both sides to see exactly what is used.
HOW IT'S BUILT
Change the height and the build changes
For a banner frame, a taller print means longer columns and a beam across the top to hold it. We don't reuse the same build at a different height.
H 2.5m
2 installersLow banner · columns only
- 200 truss 2m × 4
- Six-way corner × 4
A low banner stands on columns alone.
H 3.5m
3 installersTall banner · beams added
- 200 truss 3m × 6
- 200 truss 2m × 4
- Six-way corner × 6
Height brings in 3m beams, and crew size rises with it.
More structure means more crew. Truss is raised by people — under-crewing a build is what pushes a schedule.
WHAT WE MAKE WITH IT
Four things we build from truss

Lit rig
Squares and diamonds layered overhead, with the truss itself lit. Fixtures don't just hang from it — the truss becomes the glowing graphic.

Building a structure
Columns and beams in truss, then walls over them — a whole building stands in an empty yard. Pop-up stores and brand pavilions, built from scratch.

Truss wall
A truss frame wrapped in a printed banner becomes a wall — a large graphic wall of any size, even where there is no wall.

Gates · structural forms
Portal gates, photo-zone frames, brand forms. Away from the stage, truss is still the material that makes shape.
CASES
How it actually looked


NEXON FC Mobile · NEXT FOOTBALL showcase
Wrap a truss frame in a banner
A 12.6m wide, 3.6m high frame in 200 box truss and cubes, then wrapped in a printed banner — a brand wall stands in an empty forecourt.



3D structure
Truss back · twin towerCulture Station Seoul 284 · old Seoul Station hall
A truss tower for a 7.6m vertical screen
Beside a steam locomotive, a two-column 200 box truss tower carries a 7.6m flexible LED that curves down onto the floor — structurally reviewed and modelled in 3D first, then built exactly as designed, free-standing with nothing fixed to the heritage building.


01 · Flying the truss rig
02 · Fitting moving lights
03 · Rig flown
Finished
Rigging the ceiling truss — lift work in progressNEXON FC Mobile showcase · indoor
A glowing triangle rig overhead
200 box truss built into triangles and squares, flown from the ceiling, fitted with moving lights and lit from inside so the structure itself glows.
01 · Ground frame assembly
02 · Lifting the frame by crane
03 · Truss work complete
FinishedCass pop-up · Seongsu
A building raised in an empty yard
200 box truss laid out and assembled on the ground, lifted into a frame by crane, then walled in — an empty yard becomes a brand building in days.

15th Hwaseong Boating Festival · Jeongok Port
An entrance turned into a sea tunnel
A truss portal and roof beams with rows of blue and white flags hung beneath — visitors walk through the waves into the festival.
WHY
The people who build it are the people who run it
We own the equipment
Truss, LED, audio and lighting are ours, and we install and operate them ourselves — no layers in between, so schedule and cost are settled directly.
Install and strike crew included
We don't drop equipment and leave. The same team stays from load-in to strike.
We model it first
Structure, circulation and sightlines are checked in drawings and 3D before we go to site.
Image included
One team hangs the LED on the truss and runs the content on it.

CONTACT
Just tell us about the site
Venue, date and rough screen size are enough for us to shape a build and a ballpark scale. You don't need drawings. One photo is enough to start.
VIEW MEDIA CO., LTD. · design · install · operate · strike