LED installed at the K-Playground permanent store on Piccadilly, London

LED INSTALLATION

Put it up once
and it works for years

Not a screen you rent for an event, buta screen that stays on the building. Design, manufacture, installation and maintenance —we do it ourselves.

WHERE

We start by deciding where it goes

The same LED needs different brightness on a building exterior than inside a shop. Outdoors it has to fight daylight; indoors people stand close, so the pixels must not show. So we settle «where it goes and from how far it is seen» first, and fit the specification to that.

Building exteriors · media façades

High brightness outdoors. It serves as night staging and advertising at once.

In-store and lobby media walls

Seen from close by, so it needs a fine pitch.

Replacing outdoor signage

An existing sign becomes an LED sign whose content changes.

Transparent LED on glass

A screen laid on the glass while the daylight stays.

CASES

Sites we installed ourselves

All permanent installations designed and built by VIEW MEDIA.

K-Playground, Piccadilly, London — Whole-store LED for an overseas permanent site

K-Playground, Piccadilly, London

London, UK · permanent K-culture hub store

Gridwiz headquarters — Whole-building LED for a corporate headquarters

Gridwiz headquarters

Lobby and 2F signage

PAPER CRANE, Solargo Hotel Myeongdong — Large media wall in a hotel lobby

PAPER CRANE, Solargo Hotel Myeongdong

Hotel ground floor · large wall LED

Paper Crane Café, second branch — Permanent media wall for an F&B store

Paper Crane Café, second branch

In-store wall LED media wall

Outdoor LED, Suwon Tongdak Street — An existing sign replaced with LED

Outdoor LED, Suwon Tongdak Street

Commercial district · replacing a sign

Hanwha Momentum Changwon Memorial Factory — Transparent LED on a glass surface

Hanwha Momentum Changwon Memorial Factory

Lobby · Invisible transparent LED

Play Dopamine B1, Hongdae — Permanent LED that shapes a space

Play Dopamine B1, Hongdae

Cyberpunk K-pop space

Gridwiz 2F signage — Corporate signage

Gridwiz 2F signage

Second floor · wayfinding signage

PROCESS

How it goes

01Site surveyWe look at the mounting surface, the power, the viewing angle and the ambient brightness in person. We do not decide from photos alone.
02Design and specificationPixel pitch, cabinet format and structure are set to the site. Brightness and viewing distance are the yardstick.
03Manufacture and supplyProduction starts once the specification is fixed. We advise the shipping and customs schedule separately.
04InstallationStructure, electrics, modules and controller — our own crew does all of it.
05MaintenanceOne-year parts warranty. If the cause is a defect, there is no call-out charge.

※ For an installation, the screen price comes first and the structure and electrics are fixed after the site survey. That is why the first quote leaves the structure line as «to be confirmed on site».

One photo of where it goes
and we will price it

You do not need the dimensions. Just send a photo of the site and roughly where it goes.